About
This bridge was built in 1994. The driving surface was cracking and was in need of repair.
With this project, we:
Repaved the bridge.
Installed new bridge rails.
Replaced joint seals.
Removed and replaced the road surface right before and after the bridge.
Replaced the existing guardrail.
Applied new permanent striping.
Schedule
Design: 2023
Construction: completed in October 2024.
Location
I-5
|
Northbound, milepost 241.31 to 241.39
Cost and Funding
Design and Construction: $1,242,948