U.S. 101: Siuslaw River Bridge

Design Phase

Region 2: Willamette Valley and Northwest Oregon (Florence, Josephine)


​​We are making repairs to preserve the Siuslaw River Bridge.​


Banner image: Designing a Modern Transportation System and Investing in Oregon’s Future.

Details

About

Enlarged Project Area MapThe Siuslaw River Bridge is in fair condition but needs repairs to preserve and extends its useful life. The bridge surface currently has a lot of patches and damage from tire tracks. Several support columns are  cracking and damaged. The sidewalks and curbs are  cracked and separating.

To repair the bridge, we are:

  • Installing a new deck surface to preserve the bridge and give you a smoother ride.
  • Making repairs to the concrete columns.
  • Removing and repairing the deck joints.
  • Removing and replacing the protective paint that helps extend the life of the bridge.  
  • Looking at what erosion control measures can be done to help preserve the bridge. 

We're planning to build and will have a better idea about the construction schedule and cost as we get further in design.

Schedule

Design: 2024-2026

Construction: 2027​

Location

U.S. 101 |

​Milepost 191

Cost and Funding

Design: $575,000

Construction: $2.2 million


Pedestrians, including those with disabilities, will have access through or around the work zone. 

Contacts & Media

Project Area Map

Project Contacts

Transportation Project Manager
Nate Neal
Email
nathan.e.neal@odot.oregon.gov
Phone
541-953-8211

Public Information Officer
Mindy McCartt
Email
mindy.m.mccartt@odot.oregon.gov
Phone
503-507-6045

Get Project Alerts

Sign up for the newsletter!

Last Updated

9/5/2024 8:03 AM

Project Number

23127