About
The current traffic light poles at the off-ramp intersection of Beltline Highway connecting to Delta Highway are wooden, outdated and in need of replacement.
We're planning to:
- Replace the existing wooden poles with steel poles.
- Upgrade the traffic light equipment.
We're planning to build and will have a better idea about the construction schedule and cost as we get further into design.
Schedule
Design: 2023 - 2024
Estimated Construction: 2027
Location
OR 569
|
Beltline and Delta Highway intersection at milepoint 10.5
Cost and Funding
Design: $296,882
Construction: not currently funded