OR 99E: Road Paving

Design Phase

Region 2: Willamette Valley and Northwest Oregon (Hubbard, Marion)


​​​​​We're repaving the road to create a smooth ride and reduce maintenance costs. ​


Banner image: Designing a Modern Transportation System and Investing in Oregon’s Future.

Details

About

Enlarged project area mapOR 99E is heavily used and this portion of the highway is in poor condition, difficult and expensive to maintain. The current conditions create a bumpy ride for people driving through the area. 

​We'll repave the road between Dimmick Lane and Fobert Road NE in Hubbard​ and make bike and pedestrian improvements. 

With this project we will look to:

  • Preserve the road, reducing maintenance costs and giving you a smoother ride. ​
  • Add additional sidewalks and curb ramps to improve accessibility for pedestrians moving through the area.
  • Update guardrail where needed to meet current design standards.
  • Review property accesses and driveways to determine if improvements are needed to tie into the new pavement or sidewalk.
  • Review utility locations and determine if they need to be moved.
  • Update signs and striping.

​We're planning to build and will have a better idea about how much construction will cost and what the schedule will be as we get further into design.

Schedule

Design: 2024-2025
Estimated construction: 2026

Location

OR 99E |

​Between milepost 27 to 30.7

Cost and Funding

Design: $913,000
Construction: not currently funded. 

​Pedestrians, including those with disabilities, will have access through or around work zones. ​

Contacts & Media

project area map of 99E through Hubbard, Oregon.

Project Contacts

Transportation Project Manager
Kumar Rethnasamy
Email
kumar.rethnasamy@odot.oregon.gov
Phone
503-383-6223

Public Information Officer
David House
Email
david.j.house@odot.oregon.gov
Phone
503-551-8641

Get Project Alerts

Sign up for the newsletter!

Last Updated

7/8/2024 4:32 PM

Project Number

22793