East of the town of Oakridge on OR 58, the surface of the highway and one bridge was in bad condition.
After winter 2022, we looked at the highway and found we needed to prioritize repaving to preserve the road and prevent further deterioration and more costly repairs.
We:
Removed and replace the old asphalt on about eight miles of road.
Removed and replace about two inches of concrete on the bridge west of the tunnel.
Provided a smoother surface for drivers.
Schedule
Design: 2022-2024
Construction: completed October 2024
Location
OR 58
|
Milepost 48.4 to 56.1 east of Oakridge
Cost and Funding
Design: $873,000