About
Much of the roadside barrier in Oregon is outdated. There are several locations along our highways where the barrier at bridge ends is either missing or is not connecting.
For this project, we are:
Upgrading the outdated roadside barrier along OR 6.
Installing new barrier at bridge ends where it is missing.
Replacing curb ramps at the bridge between Mills Bridge Road and Pete Street to make them ADA compliant.
Roadside barrier helps to lessen the severity of a crash and make the roads safer for drivers.
Schedule
Design: 2023-2024
Construction: 2025
Location
OR 6
|
Milepost 0 - 51.5
Cost and Funding
Design & Construction: $10,890,272
Pedestrians, including those with disabilities, will have access through or around
the work zone.