About
The prior South Fork Beaver Creek Bridge, built in 1961, was made of timber and was narrow and in poor condition. This bridge is part of a U.S. 101 bypass between the area of Bayshore and Seal Rock.
For this project, we replaced the existing timber bridge with a new concrete bridge that has wider shoulders.
Replacing this bridge allows vehicles to continue to safely use this route as a bypass for U.S. 101.
Schedule
Design: 2022-2023
Construction: completed October 2024
Location
N/A
|
South Beaver Creek Road | Milepoint 1.1
Cost and Funding
Design: $505,600
Construction: $1.6 million