Significant erosion at these bridges requires repairs. We will replace bridge approach slabs that are in poor condition and have failed connections. (See photo to the right.)
Slope reinforcements under bridges are undermined, collapsing and soil is eroding onto the roadway under the structures due to leaking joints. We will repair or replace these damaged slopes. (See photos below.)
Repairs will be made to the eastbound and westbound interstate bridges at both locations.

Location
I-84
|
Interstate bridges at:
- Exit 353, U.S. 30 (Farewell Bend).
- Exit 362, Moores Hollow Road.
Cost and Funding
The current project cost estimate is $7.5 million through construction.
Contractor
Wildish Construction | Eugene, OR