I-5: Road Repairs (Goshen to Cottage Grove)

Project Completed

Region 2: Willamette Valley and Northwest Oregon (Lane)


​​​​​​​​​​​​​​​​​​​We repaired the road to extend the life of the pavement and to give you a smoother ride. ​


Banner: Slow down, in the work zone it could save lives. Building a modern transportation system to help Oregon’s communities and economy thrive. During construction, Give yourself more time, try a new way or mode to get there or take a different route.

Details

About

​​We made repairs to the road to extend the life of the pavement and make it safer for drivers. 

This section of roadway showed signs of wear, cracking and potholes. Worn roads are less safe for drivers and leads to increased gas and maintenance cost for drivers.

​With this project, we completed maintenance repairs before extensive work was required.  We:

  • Patched failures in the existing concrete pavement.

  • Resurfaced the asphalt to repair cracking, rutting and wear.

  • Repaired northbound and southbound lanes. 

  • Repaved ramps.

  • Replaced bridge joints.

  • Replaced bridge deck membranes, or the protective layer on the bridge surface.​​

Schedule

Design: 2020-2022
Construction: completed October 2024

Location

I-5 |

​Milepost 174.9 to 187.9

Cost and Funding

​$9.2 million

Contacts & Media

Project Area Map

Project Contacts

Resident Engineer – Consultant Projects
Julie GaNung
Email
julie.e.ganung@odot.oregon.gov
Phone
541-726-2578

Public Information Officer
Mindy McCartt
Email
mindy.m.mccartt@odot.oregon.gov
Phone
503-507-6045

Get Project Alerts

Sign up for the newsletter!

Last Updated

11/13/2024 10:32 AM

Project Number

21540