I-105 Paving from Willamette River to I-5

Construction Phase

Region 2: Willamette Valley and Northwest Oregon (Eugene, Lane)


​​​​​​​​​​​​​​​​​​We're repaving to preserve the road and give you a smoother ride.​


Banner: Slow down, in the work zone it could save lives. Building a modern transportation system to help Oregon’s communities and economy thrive. During construction, Give yourself more time, try a new way or mode to get there or take a different route.

Impacts

Traffic Impact

None at this time. Use caution as you drive through the work zone. ​

Construction Impacts

None at this time. We plan to resume work in early July. You can expect:

  • Crews working Sunday night through Friday morning from 7 p.m. to 5:30 a.m.
  • Nighttime single lane and ramp closures as needed.
  • Crews in both eastbound and westbound lanes.
  • Construction noise and delays. 

Construction Activities

We're installing a new protective surface to preserve the I-105 bridges over I-5 and Coburg Road for both east and westbound directions.

Visit TripCheck ​for the most current traffic information. ​​


work zone construction iconPay attention in the work zone, slow down and move over – imagine this is where you work! 

Always drive safely, watch for construction signs and workers. 

Remember: fines double in all Oregon work zones, whether workers and signs are present or not. ​

Details

About

​We're repaving I-105 between Delta Highway and Pacific Highway (I-5) including several on- and off-ramps within the project area. We're also replacing the surface on seven bridge decks.

The current pavement and bridge decks are in poor condition. To preserve them and improve overall safety, we're removing and replacing the surfaces. This will help extend the useful life for these roads and bridges and give you a smoother ride. 

Project work will include:

  • Repaving I-105 and the identified I-105 and I-5 on- and off-ramps.
  • Removing and replacing seven bridge deck surfaces.
  • Adding rumble strips between milepost 2.25 and 4.
  • Adding reflective strips to guardrails for improved visibility.

​Schedule

Design: 2022
Construction: 2023-2024

Location

I-105 |

​Milepost .91 to 4 and multiple connection ramps

Cost and Funding

​$11.2 million

Contacts & Media

Project Area Map

Project Contacts

Resident Engineer
Shane Prohaska
Email
shane.prohaska@odot.oregon.gov
Phone
541-744-8080

Public Information Officer
Mindy McCartt
Email
mindy.m.mccartt@odot.oregon.gov
Phone
503-507-6045
Public Comment Form
Submit a commentfor project

Get Project Alerts

Sign up for the newsletter!

Last Updated

6/14/2024 11:22 AM

Project Number

21538