About
The Trask River Bridge is located on U.S. 101 in Tillamook County. We're providing erosion repair to the existing bridge supports.
We're placing riprap, a type of large rock used for erosion control, at locations along the bridge supports.
This will help keep the bridge sturdy and protect it from water erosion.
Schedule
Design: 2023-2025
Construction: estimated to start in 2026
Location
U.S. 101
|
Milepost 68 | Trask River Bridge
Cost and Funding
Design and construction estimate: $1,000,000
Pedestrians, including those with disabilities, will have access through or around the work zone.