The Ellsworth Street Bridge is a historically significant bridge built in 1925. The overhead beams have been damaged by trucks higher than allowed crossing the bridge.
This project will develop plans to increase vertical clearance from 14-feet and 11-inches to 16-feet. Increasing the height clearance will reduce the amount of maintenance needed to repair the bridge.
![Bridge Picture](/odot/Projects/Project%20Images/20428_EllsworthBridge.jpg)
Schedule
Design: 2019-2023
Estimated construction: Spring 2024
Location
U.S. 20
|
Ellsworth Street crossing over Willamette River.
Cost and Funding
Design: $736,000
Construction: $5.1 million