U.S. 101: Urban Upgrades (Garibaldi)

Construction Phase

Region 2: Willamette Valley and Northwest Oregon (Garibaldi, Tillamook)


​​​​We're rebuilding the road, sidewalks and curb ramps on U.S. 101 through Garibaldi​ to help make the area safer for all.


Banner: Slow down, in the work zone it could save lives. Building a modern transportation system to help Oregon’s communities and economy thrive. During construction, Give yourself more time, try a new way or mode to get there or take a different route.

Impacts

Traffic Impact

Use caution – expect shoulder and lane closures with flaggers helping direct traffic as needed.

Construction Impacts

You can expect:

  • Crews working Monday through Friday from 7 a.m. to 5 p.m.
  • Occasional nighttime work as needed.
  • Sidewalk closures with pedestrian detours as needed.
  • Lane closures with flaggers helping direct traffic as needed.​
  • Construction noise and debris.
  • Delays.
  • Businesses in the project area to remain open.

Construction Activities

We're making improvements in the area, whether you drive, ride, walk or roll.

Visit TripCheck​ for the most current traffic information.​


​Pedestrians, including those with disabilities, will have access through or around work zones. ​


work zone construction iconPay attention in the work zone, slow down and move over – imagine this is where you work! 

Always drive safely, watch for construction signs and workers. 

Remember: fines double in all Oregon work zones, whether workers and signs are present or not. 

Details

About

The pavement on U.S. 101 inside the City of Garibaldi is degraded and needs to be repaved to extend its life. 

Enlarged project map

The slope of the road at crosswalks is too high to meet current ADA standards and needs to be fixed before the road can be paved.

We are:

  • Repaving the road and applying new striping.

  • Constructing new ADA curb ramps at the rail crossings on 3rd Street and 7th Street.

  • Creating bus stop pull out locations.

  • Building new sidewalks between 1st Street and 11th Street.

  • Click here to sign up for email updates.

    Enhancing street signs to make it easier to know where you're going through downtown.

  • Improving water drainage.

Sign up for project email alerts​ to stay up to date on traffic impacts and learn more about the work we're doing! 

Schedule 

​Design: 2019-2023

Construction: 2024-2025

Location

U.S. 101 |

Mileposts 54.8 – 55.9

Cost and Funding

​Design & Construction: $10,631,500​

Contacts & Media

Project map

Project Contacts

Assistant Resident Engineer
Matt Johnson
Email
matthew.r.johnson@odot.oregon.gov
Phone
503-440-5572

Public Information Officer
David House
Email
david.j.house@odot.oregon.gov
Phone
503-551-8641

Get Project Alerts

Sign up for the newsletter!

Last Updated

8/16/2024 9:11 AM

Project Number

20252