OR 58 Culvert Repair and Replacement Project

Project Completed

Region 2: Willamette Valley and Northwest Oregon (Klamath, Lane)


​​​​​​​​​​​​​​​​​​​​​​​We repaired or replaced culverts along the highway that were in poor condition.


Banner: Slow down, in the work zone it could save lives. Building a modern transportation system to help Oregon’s communities and economy thrive. During construction, Give yourself more time, try a new way or mode to get there or take a different route.

Details

About

​The OR 58 corridor is a lifeline route between the southern Willamette Valley (I-5) and Central Oregon (U.S. 97). There have been several projects to explore how to help keep critical services accessible. 

This project identified 54 culverts needing repair or replacement because they were in poor or critical condition. The culverts were reviewed to see if sizes needed to be increased to address water flow or fish passage.

The shallow culverts required digging trenches through the road and the deeper culverts were​ replaced by drilling under the road.

This project was developed by Western Federal Lands, a division of the Federal Highway Administration.

​Schedule

Design: 2019-2022

Construction: completed October 2024

Location

OR 58 |

​From I-5 to U.S. 9​7, milepost 2.73 to 64

Cost and Funding

​$12.6 million

Contacts & Media

Project Area Map

Project Contacts

Resident Engineer – Consultant Projects
Julie GaNung
Email
julie.e.ganung@odot.oregon.gov
Phone
541-726-2578

Public Information Officer
Mindy McCartt
Email
mindy.m.mccartt@odot.oregon.gov
Phone
503-507-6045

Last Updated

11/13/2024 10:32 AM

Project Number

20102