About
We continued improvements on OR 219 in the City of Newberg to improve pedestrian safety.
We:
Constructed sidewalks on the west side of OR 219 by replacing the drainage ditch with sidewalks.
Installed ADA compliant curb ramps.
Improved drainage.
Added striping bike lanes on both sides of the road.
Schedule
Design: 2020-2022
Construction: 2023-2024
Location
OR 219
|
Aldercrest Drive to E Edgewood Drive
Cost and Funding
$2.9 million