About
With the existing culvert, water passes through and exits as a waterfall, which prevents fish from passing through the culvert.
We will:
Work will also include building a temporary diversion for a detour.
Schedule
Design: 2019-2025
Construction: 2027
Location
U.S. 101
|
Milepost 34.8
Cost and Funding
Design and Construction: $17.99 million
Pedestrians, including those with disabilities, will have access through or around work zones.