| Energy Facilities Under Review |
|
|
|
 |
| Antelope Ridge Wind Power Proj |
|
Proposed Facility: Wind energy facility with a nominal (name plate) generating capacity of approximately 300 megawatts.
Location:
Union County, Oregon.
Status:
The Notice of Intent has been submitted and the Project Order has been issued.
The Preliminary Application for Site Certificate has been submitted and is under review by local, state, federal, and tribal agencies. When the application has been deemed complete it will be sent out for public review.
Applicant:
Horizon Wind Energy, LLC
Contact:
Valerie Schafer Franklin
Project Development Manager
Antelope Ridge Wind Power Project
Horizon Wind Energy
53 SW Yamhill Street
Portland, OR 97204
(503) 222-9400
Department of Energy Staff: Sue Oliver
History:
- April 27, 2009: Applicant submitted a Notice of Intent.
- June 24, 2009: The Department of Energy issued the Project Order.
- October 19, 2009: Applicant submitted a preliminary Application for Site Certificate.
Documents:
|
|
 |
| Boardman to Hemingway |
|
Proposed Line:
Approximately 298 miles of single circuit 500 kilovolt (kV) transmission line connecting the power plant near Boardman, Oregon and the planned Hemingway substation near Murphy, Idaho
Location: Boardman, Oregon to Southern Idaho
Status:
The Oregon Department of Energy (ODOE) received a Notice of Intent (NOI) from Idaho Power Company (Idaho Power) on August 28, 2008 to apply for an Energy Facility Site Certificate for a new transmission line, called the Boardman to Hemingway Transmission Line Project. The proposed transmission line consists of approximately 298 miles of single circuit 500 kilovolt (kV) transmission line connecting the power plant near Boardman, Oregon and the planned Hemingway substation near Murphy, Idaho. The proposed transmission line will cross federal, state and private lands.
Applicant:
Idaho Power Company (Idaho Power)
Website: http://www.boardmantohemingway.com/idaho_power.aspx
Contact:
Eric Hackett, Project Manager
PO Box 70
Boise, ID 83707
Phone: 208-388-5712
E-mail Eric
Department of Energy Staff: Adam Bless
History:
Documents:
|
|
 |
| Carty Generating Station |
|
Proposed Facility: Natural gas-fueled combined cycle combustion turbine facility with a nominal generating capacity of approximately 900 megawatts (MW) of electrical power.
Location:
Morrow and Gilliam County, Oregon.
Status:
The Notice of Intent has been submitted
The Project Order has been issued.
Applicant:
Portland General Electric Company
Contact:
Ray Hendricks
Environmental Engineer
Portland General Electric Company
121 SW Salmon Street
3WTC-BR05
Portland, Oregon 97204
(503) 464-8519
Ray.Hendricks@pgn.com
Department of Energy Staff: Sue Oliver
History:
Documents:
|
|
 |
| Montague Wind Power Facility |
|
Proposed Facility: The proposed facility is a wind energy facility with a peak generating capacity of up to 404 megawatts.
Location:
Morrow County and Gilliam County
Status:
The applicant has submitted a Notice of Intent to apply for a site certificate.
Applicant:
Iberdrola Renewables, Inc.
Contact:
Sara McMahon Parsons
Iberdrola Renewables, Inc.
1125 NW Couch Steet, Suite 700
Portland, OR 97209
(503) 796-7732
Department of Energy Staff: John White
History:
- November 9, 2009: The applicant submitted a Notice of Intent.
Documents:
|
|
 |
| Newberry Geothermal Project |
|
Proposed Facility: Geothermal energy facility with a peak generating capacity of up to 143 megawatts.
Location: Deschutes County.
Status:
The applicant has submitted a Notice of Intent. Exploratory work is expected to continue through 2009. The applicant will decide whether to proceed with a site certificate application in 2010.
Applicant:
Newberry Geothermal Holdings LLC
Contact:
Douglas S. Perry
Newberry Geothermal Holdings LLC
300 Atlantic Street, Suite 301
Stamford CT 06901
(203) 276-1600
Department of Energy Staff: John White
History:
- July 3, 2008: Applicant submitted a notice of intent.
Documents:
- Notice of Intent, July 2008
Part A (applicant information) [906 kb pdf] Part B (project description and location) [176 kb pdf] Part C (project location map) [372 kb pdf] Part D (additional information) [384 kb pdf]
|
|
 |
| Saddle Butte Wind Park |
|
Proposed Facility:
The proposed facility is a wind energy facility with a peak generating capacity of up to 564.3 megawatts.
Location:
Gilliam County and Morrow County
Status:
The Department has issued a Project Order.
Applicant:
Saddle Butte Wind LLC
Contact:
Patricia Pilz
656 San Miguel Way
Sacramento, CA 95819
(916) 456-7651
Department of Energy Staff: John White
History:
- August 7, 2009: Applicant submitted a Notice of Intent.
- October 20, 2009: the Department of Energy issued a Project Order
Documents:
|
|
 |
| Summit Ridge Wind Project |
|
Proposed Facility: Wind energy facility with a nominal (name plate) generating capacity of approximately 200 megawatts.
Location:
Wasco County, Oregon.
Status:
The Notice of Intent has been submitted
The Project Order has been issued
Applicant:
LotusWorks – Summit Ridge I, LLC
Contact:
Steven Ostrowski, President
LotusWorks – Summit Ridge I, LLC
9611 NE 117th Ave, Suite 2840
Vancouver, WA 98662
(360) 737-9692
Department of Energy Staff: Sue Oliver
History:
- May 28, 2009: Applicant submitted a Notice of Intent.
- July 30, 2009: The Department of Energy issued the Project Order.
Documents:
|
|
| |
|
|