  • Replace worn and/or broken weather-stripping and caulking.

Insulation
 
  • Replace water damaged insulation

Space Cooling
  • Repair insulation on cooling system pipes.
  • Isolate off-line chillers.
  • Adjust head and suction pressures

Controls
 
  • Adjust controls to stage compressors
  • Reset high/low pressure control differential settings
  • Install locking thermostat covers
  • Calibrate all sensors and gauges
  • Reduce/eliminate simultaneous heating/cooling (check with engineer if this strategy applies to particular buildings
  • Develop load vs. capacity matrix and match load with equipment capacities

Maintenance
 
  • Remove scale deposits from shell/tubes on water condensers

Space Heating
Controls
 
  • Calibrate all sensors and gauges.
  • Develop load vs. capacity matrix and match load with equipment capacities.

Boiler Issues
 
  • Tune up boiler by adjusting air-fuel ratio. Isolate off-line boilers.
  • Remove scale deposits, accumulation of sediment and
  • boiler compounds on water side surfaces (especially rear portion of boiler).

Maintenance
 
  • Repair steam traps.
  • Repair or replace broken or missing insulation on pipes.

Lighting
.

Ventilation/Distribution
 
Re-wire restrooms' exhaust fans to operate only when lights are on.

Controls
 
  • Set controls to automatically close all outdoor air intake dampers when equipment is shut off and when building is unoccupied.
  • Adjust economizer for proper operation.

Repair
 
  • Repair leaky ductwork

Maintenance
 
  • Adjust dampers and damper actuators for proper function.
  • Adjust dampers to ensure complete closure.
  • Re-adjust position indicators to accurately indicate damper positions.

Domestic Hot Water
 
  • Repair/replace pipe insulation.
  • Schedule heater and recirculation pump to operate only during occupancy periods.

Controls
  • Calibrate all sensors (e.g., temperature, pressure, CO2) per manufacturer's recommendations.
  • Repair and/or calibrate thermostats.
  • Prevent simultaneous heating and cooling within zones and within school building (Check with engineer if appropriate for particular buildings).
  • Install locking thermostat covers.
  • If BAS/DDC/EMS system exists,
    • Set up warm up cycle (close outside air damper during unoccupied period).
    • Set up discharge air temperature reset.

    • Set up discharge water temperature reset.
    • Set up economizer.
    • Set up optimum start/stop (close outside air damper during unoccupied period).

Pneumatic
 
  • Repair excessive leaks in pneumatic controls

Kitchen Equipment/Systems
 
  • Adjust defrost cycles
  • Adjust head and suction pressures
  • Replace insulation on suction and liquid lines

Electrical Equipment
  • Install a time clock on electrical equipment (e.g., bus block heaters)

Renewable
.

Miscellaneous
Training
 
  • DDC training.
  • Pneumatic training.
  • Chiller/refrigeration/heat pump training.
  • Boiler training.Ventilation training.
  • Utility accounting training (w/software).

Other
Information for SB 1149 Qualified Energy Auditors
 
Energy Efficient Measures

 
Page updated: August 01, 2007

Click here to go to the Oregon Dept. of Veterans' Affairs outreach contact form

Get Adobe Acrobat ReaderAdobe Reader is required to view PDF files. Click the "Get Adobe Reader" image to get a free download of the reader from Adobe.